← Previous Page

Client
District of North Vancouver

Location
North Vancouver, BC

Value
$36.6M

Completion
2020 (projected)

Sectors
Emergency Services

Services
Prime Consulting, Architecture, Interior Design

Size
46,500 sq. ft. | 4,320 sq. m.

Project Description

This state-of-the-art Fire Hall will be the replacement hall for Fire Hall No. 2, will replace the existing North Shore Fire Training Centre, and will relocate the Fire and Rescue Service headquarters to the Maplewood neighbourhood, including the departmental and fire back-up Emergency Operations Centre with dispatch.

Besides the headquarters and indoor training building, the facility will include a four double bay Fire Hall, a training building with apparatus bays and support areas, and a 1.6 acre outdoor area for training, including:
• Training tower
• Fire behaviour training
• Auto extrication
• Collapse Ditch / USAR
• Construction tower crane
• Cell tower
• Drafting Pit
• Hose training
• 2 fire simulation buildings
• Apparatus driver training
• High angle training
• Evolution training